• 学校的历史

     
    1967 休伦高中 scheduled to open.
     
    1968-69 "Pioneer" students attend Ann Arbor High School in the morning, "Huron" students attended in the afternoon. Huron (the campus) opened in 1969. Originally, classes were held at Ann Arbor High School (now known as Pioneer High).
     
    1969年秋季 休伦高中 opened for grades 10 - 12.
     
    1970 Huron wins its first state championships in swimming and cross country.
     
    1972 Ninth graders selected on the basis of academic merit were chosen from the district's junior highs to form Huron's first freshmen class.
     
    1973 Student Council members voted themselves out of the office because they felt that they held no power with the administration.
     
    1982年春季 Peer facilitation program began.
     
    1988年春季 Ann Arbor Board of Education passed a $31 -million renovation and construction program. The Student Advocate School Board (SASB) convinced the school board to adopt a renovation plan without enclosing the arch.
     
    1988-1991 Renovations included alterations to Huron structure. 从1970年代开始, the library and lunchrooms have been enlarged and science and math wings have been added. Extensions of the science wing (5200), 乐队室(7124), the math department (6100, 6200), the athletic wing including the  new gym (1100) and athletic department offices.
     
    1989年秋季 Transition of 9th grade instruction from middle school/junior high to Huron completed.
     
    1992-93 Split lunch rule instated.
     
    1993年春季 The auditorium is dedicated to Paul K. 迈耶斯.
     
    1995-97 The athletic facilities were improved by the additions of the new pool, 重量 room (formerly old pool), a track and football stadium.
     
    1997年秋季 The football stadium was lighted for evening games.
     
    2004 艺术ificial turf replaced grass in the Stadium. Exterior Sign年龄 (“Riverbank Stadium” and “首页 of the River Rats” signs) added to Press Box and additional sign年龄 to Concession Stands.
     
    2006年夏天 Over the summer the road under the ARCH was closed and the area resurfaced with concrete. An extensive patio area, pavered pathways and landscaping which included several trees and plantings were added.
     
    2008年秋季 天际线高中 opens to ease overcrowding at Huron and Pioneer. New admin wing opens (6100). Dome gym Tartan floor replaced with a new wood floor.
     
    2010年夏天 9000 Portable (6-plex) removed. 
     
    2011年夏天 8000 Portables removed.
     
    2013年秋季 Green House student run store opens after being renovated from former graphic arts lab.
     
    2014-15 Board votes to make Mitchell, Scarlett and Huron IB candidate schools.  One lunch reinstituted for one year.
     
    2015年春季 Metals lab 2202 renovated into new PLTW (Project Lead the Way) engineering lab.
     
    2016年秋季 2201 renovated into second PLTW engineering lab.
     
    2017年春季 Mitchell, Scarlett and Huron become official World IB schools. Huron also becomes a candidate school for the IB Career-related Programme. The small theater is dedicated to Dr. Richard Ingram and the softball field dedicated to Dottie D. 戴维斯.